Operation
Ill. 6: Teleshake 95 installation
a. Pull the power plug of the Liquid Handling Station and open the front door.
b. Remove the blind plug at the opening on the back of the device.
c. Set the Teleshake 95 to one of the positions P2 ... P4 and run the Sub-D connector through the opening.
NOTICE! The positions P2 ... P4 are suitable due to their proximity to the opening on the back of
the device.
d. Connect the Sub-D connector to a slot module. NOTICE! The color of the shrink sleeve on the con-
nector must match the color coding next to the slot module on the control unit.
e. Connect the USB cable of the Liquid Handling Station, FlowBox (if available) and MTC or STC control unit
to the USB hub and connect the USB hub to your laptop/PC.
f. Configure the Teleshake 95. Also observe the INHECO instruction manual: https://www.inheco.com/ser-
vice/downloads.html.
See also
→ Device set up with Device Manager (p. 418)
→ Shake Command (p. 330)
→ Heat Command (p. 332)
246
Operating manual English
Liquid Handling Station