Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Bosch EPS 205 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für EPS 205:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
56 | EPS 205 | Operation
5.

Operation

5.1
Switch-on/switch-off
Use the central master switch on the front of the
unit (see Fig. 1, item 6) to switch on the EPS 205.
 After switch-on, the Windows operating system
starts up and then the EPS 200 system software.
Before switching off at the central master switch,
first end the EPS 200 system software and then shut
down the Windows operating system.
i
Prior to renewed switch-on, the EPS 205 must have
been switched off for at least 60 seconds.
i
Do not switch off the EPS 205 while component
testing is in progress (except in the case of
emergency stop). Always switch off the EPS 205
by way of the central master switch on the front
of the unit before unplugging the three-phase AC
connector.
i
Always connect the printer by way of the USB
connecting cable before switching on the EPS 205.
i
During operation of the EPS 205, problems may be
encountered if use is made of auxiliary equipment
(e.g. printer, DVD drive, connecting cables) not
supplied by Bosch.
5.1.1
Touch screen with pen
The touch screen of the EPS 205 is operated with a pen
which basically has the same functions as a mouse (see
Online Help).
5.1.2
Screen keypad
The EPS 200 system software provides users with a
screen keypad which is operated with the pen (see
Online Help). The screen keypad is shown in the dialog
window on pressing <F2>.
|
1 689 989 185
2018-03-24
5.2
Preparation for testing
R
Before performing any CRI/CRIN, CRI Piezo or DHK/
UI tests, always check the oil level indicator (Fig. 1,
item 8) to make sure there is sufficient test oil in the
tank.
!
The test oil level must always be above the
inspection port mark.
R
We recommend performing a leak test every
day (sealing plug on connection adapter, see
Sec. 3.6.16). The leak test can be called up under
"Service >> Equipment diagnosis".
R
To avoid contamination of the test oil, each
CRI/CRIN, CRI Piezo and DHK/UI component must
be cleaned before testing. Never fit damaged,
contaminated and/or severely corroded CRI/CRIN,
CRI Piezo and DHK/UI for testing.
Robert Bosch GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis