8
Commissioning
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Damage or destruction of the device by arc and high pressure is
possible if improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).
Before commissioning, do the following:
• Check the mounting and installation.
• Enclosure must not be damaged.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check whether all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check whether all conductors have been clamped firmly.
• Observe the line voltage.
• Seal the unused cable entries with plugs certified according to
Directive 2014/34/EU or IEC and unused drilled holes with stopping plugs
certified according to Directive 2014/34/EU or IEC.
9
Operation
The coupler socket may only be operated when fully mounted.
The coupler socket can be switched only with the plug inserted.
If the plug has been disconnected, close the hinged cover with the
bayonet ring.
Only Type 8571/12 plugs from R. STAHL may be used.
276210 / 8571645300
2020-11-03·BA00·III·en·00
DANGER
WARNING
SolConeX Coupler socket, 32 A
Series 8571/16
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
17