Commissioning
EN
8
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Before commissioning, ensure the following:
EN
• Monitor the mounting and installation.
EN
• Enclosure must not be damaged.
EN
• Remove any foreign objects.
• If necessary, clean the connection chamber.
EN
• Check if all screws and nuts have been tightened firmly.
EN
• Check if all conductors have been clamped firmly.
EN
• Observe the line voltage.
EN
EN
9
Operation
EN
EN
EN
EN
Only Type 8571/12 plugs from R. STAHL may be used.
20
SolConeX Flange Socket, 32 A
Series 8571/15
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Damage or destruction of the device by arc and high pressure is
possible if improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).
The flange socket may only be operated when fully mounted.
The flange socket can only be switched with the plug inserted.
If the plug has been disconnected, lock the hinged cover with the
bayonet ring.
DANGER
WARNING
275582 / 8571630300
2020-11-03·BA00·III·en·00