中文
EN
DE
RU
KO
PT
JA
ES
AE1031H
If necessary, operate the
control to lower the head further.
5.After hooking the bead, release the
button and stop the
rotation
6.Move the
lever up.wards to lift the demounting tool until
moving it above the rim edge (Fig. 22d).
Facilitate the operation by using the lower bead breaker disc:
operate the
control to lift the disc in order to move the lower
bead in the centre of the well.
7.Ensure that the bead situated at 180° relative to the tool is in the well,
otherwise use the bead pressing tool to facilitate positioning (Fig. 22e). 。
8.Turn the
selector (see Fig. 22f).
128