Troubleshooting and diagnosis options

9.4 Integration of organization blocks (OBs)

If the SIEMENS SIMATIC S7 automation system is used, a number of so-called
"organization blocks" are available to the user.
Organization blocks form the interface between the CPU operating system and the
user program. With the aid of OBs program sections can be specifically executed, e.g.
when errors or process alarms occur.
Organization blocks are processed according to the priority assigned to them.
In principle the controller CPU goes into the STOP operating state in the event of an
error, unless the corresponding OB has been integrated. This is not always desirable
and can be prevented by integrating the corresponding OB. The OB need not have
been expressly programmed for this purpose. The OB only needs to be programmed
accordingly if a specific error reaction is required.
OBs are called up if the measuring system position is accessed during a failure.
For more detailed information on organization blocks please see the SIEMENS
documentation
6ES7810-4CA08-8AW1,
Volume 1/2"

9.4.1 Diagnostic alarm OB (OB 82)

This OB is generally triggered when the measuring system transmits a diagnostic
alarm to the controller, see chapter "PROFINET Diagnostic Alarm" on pages 148
and 159.

9.5 Miscellaneous faults

Fault
Cause
Strong vibrations
Measuring system
Position jumps
Electrical faults, EMC
 TR-Electronic GmbH 2018, All Rights Reserved
Page 168 of 168
"System
and
Standard
Solution
Vibrations, impacts and shocks, e.g. on
presses, are dampened with so-called "shock
modules". If the error occurs repeatedly
despite these measures, the measuring
system must be replaced.
Isolated flanges and couplings made of plastic
may help against electrical faults, as well as
cables with twisted pair wires for data and
supply. The shielding and line routing must be
executed in accordance with the Equipment
Mounting Directives for the respective field
bus system.
TR-ELA-BA-DGB-0027 v09
Functions
for
S7-300/400
Printed in the Federal Republic of Germany
03/09/2023

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis