9
Commissioning
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Before commissioning, ensure the following:
• Installation of the device according to regulations.
• Correct connection of the cables.
• No damage at the device and connection cables.
• Tight seat of the screws at the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
10
Operation
10.1 Operation
After it is properly mounted and installed, the Fieldbus Terminator is put into operation
(trunk voltage switched on).
10.2 Troubleshooting
Refer to the following troubleshooting plan for troubleshooting:
Error
Diagnostics segment
reports error
If the error cannot be eliminated using the mentioned procedures:
• Contact R. STAHL Schaltgeräte GmbH.
For fast processing, have the following information ready:
• Type and serial number of the device
• Purchase information
• Error description
• Intended use (in particular input / output wiring)
166532 / 941860310010
2020-11-06·BA00·III·en·05
Cause of error
•
Terminator not connected
•
Several terminators
connected to the segment
•
Terminator defective
DANGER
Troubleshooting
Check the terminator and
•
connect it correctly if necessary.
•
Make sure that only one terminator is
connected per segment.
•
Replace any defective terminators.
Fieldbus Terminator
Series 9418
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
13