Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Maintenance, Overhaul, Repair; Maintenance; Overhaul - Stahl 8186-Serie Betriebsanleitung

Lichtwellenleiter-spleißkassette zone 1
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9

Commissioning

Before commissioning, ensure the following:
• Device accepted and certified by a notified body for quality monitoring after installation
in a complete unit of equipment ("U" certificate for an Ex component with partial
approval that is not ready to use on its own).
• Mounting and installation of the device according to regulations.
• No damage to device.
• Remove any foreign objects.
• Fibre optics and cable ties securely locked in the FO splice cassette.
10

Maintenance, Overhaul, Repair

10.1 Maintenance

• Consult the relevant national regulations to determine the type and extent of
inspections.
• Adapt inspection intervals to the operating conditions.
During maintenance of the device, check at least:
• whether the clamping screws holding the electric lines are securely seated,
• whether the device enclosure and / or protective enclosure have cracks or other visible
signs of damage,
• whether the permissible ambient temperatures are observed,
• whether the device is used according to its designated use.

10.2 Overhaul

Observe the relevant national regulations in the country of use.

10.3 Repair

Explosion hazard due to improper repair!
Non-compliance results in severe or fatal injuries.
• Repair work on the devices must be performed only by
203681 / 818660300010
2020-06-23·BA00·III·en·04
R. STAHL Schaltgeräte GmbH.
DANGER
Optical Fibre Splice Cassette Zone 1
Series 8186
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
17

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

203633

Inhaltsverzeichnis