Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Maintenance, Overhaul, Repair; Maintenance; Overhaul - Stahl 8250/0-Serie Betriebsanleitung

Ex d-gehäuse aus aluminium / druckfeste kapselung
Vorschau ausblenden Andere Handbücher für 8250/0-Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7

Commissioning

Before commissioning, carry out the following checks:
Check the device for damage.
Check that mounting and installation have been performed correctly. When doing so,
check whether all coverings and partitions for live components have been installed and
fastened.
Make sure that all openings/drilled holes in the enclosure are sealed with permissible
components. Dust and transport protection (adhesive tape or plastic caps) fitted at the
factory must be replaced with corresponding certified components.
Ensure that seals and seal systems are clean and undamaged.
Remove any foreign objects.
Check whether all the specified tightening torques have been observed.
8

Maintenance, Overhaul, Repair

Observe the relevant national standards and regulations in the country of use,
e.g. IEC/EN 60079-14, IEC/EN 60079-17, IEC/EN 60079-19.
8.1

Maintenance

Check the following points in addition to the national regulations:
• Whether the clamping screws holding the electrical lines fit securely
• Whether the device has cracks or other visible signs of damage
• Whether the permissible temperatures are complied with
• Whether the parts are securely fitted
• Ensure it is being used as intended.
• Sufficient lubrication of Ex joint faces, screw connections and hinges
8.2

Overhaul

Perform overhaul of the device according to the applicable national regulations and the
safety notes in these operating instructions ("Safety" chapter).
8.3

Repair

Repair work on the device must be performed only by R. STAHL.
303049 / 825060300230
2022-05-30·BA00·III·en·00
Ex d enclosure made of aluminium/flameproof enclosure
8250/0 series empty enclosure,
8250/1 series terminal box,
8250/5 series control panel/control station
Commissioning
DE
EN
FR
IT
ES
RU
NL
DK
SE
FI
PT
GR
PL
CZ
SK
HU
SL
RO
BG
LV
LT
EE
CH
KR
CN
23

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

8250/1-serie8250/5-serie

Inhaltsverzeichnis