The vibration plate at a glance
Push-up
handles
LED bar (green, yellow, red)
Set up and connect
1. Select a suitable installation location with a distance of at least 1m around the device to avoid pos-
sible injuries. The surface for your assembly should be stable, level, clean and protected from impact
by a suitable underlay.
2. Connect the power cord to the device and the other end to the wall socket.
ATTENTION: An incorrect setting can lead to an incorrect load or injury during training as
well as to unwanted noise development. Align the feet so that the device is truly level. It is
essential that you align your feet so that the device is level.
Bottom
Stand
AC adapter
Bracelet
remote control
ASSEMBLY
31
Chair
Stand space
Medium coverage
LED indicator (green, yellow, red)
Top cover
min. 1 m
EN