Machine's Arrival At The Customer's - HEIDELBERG Suprasetter 106 Installation

Vorschau ausblenden Andere Handbücher für Suprasetter 106:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation Preparation
Leakage resistance
Volume resistance
Tab. Electrical floor properties
During installation, make sure that the device is installed at a sufficient distance from walls and other
objects to ensure adequate ventilation and quick servicing.

Machine's Arrival at the Customer's

The Suprasetter comes in one packaging kit.
For overseas shipping the Suprasetter is packed in a crate.
For delivery in Germany, Europe and when shipped in a container, the machine comes screwed to a
pallet and covered with protective foil.
The Suprasetter must be stored in a weatherproof environment prior to installation.
Use a fork-lift truck of sufficient capacity for unloading from the truck.
Fig. 1 Fork-lift truck and pallet
Load
Suprasetter
Suprasetter with pallet
Suprasetter with pallet and crate
Tab. Loads and weights
34
≤ 10
9
Ω
≤ 10
10
Ω
The fork arm length of the fork-lift truck must be at
least 1.75 m to go below center of mass C (Fig. 1)
and below the stabilizing bars.
Weight
1000 kg
1100 kg
1300 kg