Safety Program Creation - Configuration Example
Connect the Profinet network of the measuring system to the controller. Do this
by selecting the text Not assigned in the network view for the measuring
system with the left mouse button.
In the selection menu which opens, select the Profinet interface of the controller;
this is interface PLC_1.PROFINET interface_1 in the example project.
TR-Electronic GmbH 2019, All Rights Reserved
Page 94 of 144
TR - ECE - TI - DGB - 0340 - 01
Printed in the Federal Republic of Germany
12/17/2020