Installation of the machine
2.5 Fitting and connecting the
monitor
Fig. 12 Fitting the monitor
1) The VESA support has three different fixing points,
which thanks to the two possible fitting positions (1a-
1b) provide 5 different possible fixing heights.
The 4 screws needed (M4x10) to fix the VESA support
to the monitor are part of the kit supplied.
2) When fitting the monitor assembly you must choose
the appropriate fixing point.
The monitor assembly must be positioned in such a
way as to leave a minimum gap vertically between the
monitor and the keyboard support, allowing its angle
to be adjusted.
Operation manual
geodyna 4900 – ZEEWB729A03
Mise en place de la machine
2.5 Monter et connecter le
moniteur
Fig. 12 Montage du moniteur
1) Le support VESA présente trois points de fixation
différents, qui, grâce aux deux positions possibles (1a-
1b) de montage, donnent lieu à 5 hauteurs différentes
de fixation.
Les 4 vis nécessaires (M4x10) pour fixer le support
VESA sur l'écran font partie du kit.
2) Au moment du montage de l'ensemble écran, il sera
donc nécessaire de choisir le point de fixation qui
convient le mieux.
Placer l'ensemble écran en laissant un minimum
d'espace libre verticalement entre l'écran et le support
du clavier de manière à permettre le réglage de l'angle
de celui-ci.
Mode d'emploi
geodyna 4900 – ZEEWB729A03
17