Herunterladen Diese Seite drucken

TR-Electronic 58 Serie Montageanleitung Seite 150

Vorschau ausblenden Andere Handbücher für 58 Serie:

Werbung

Cable gland assembly, variant B
Pos. 1 Nut
Pos. 2 Clamping ring
Pos. 3 Inner O-ring
Pos. 4 Screw socket
1. Cut shield braid / shield foil back to dimension "X" + 2mm.
2. Slide the nut (1) and clamping ring (2) over the cable.
3. Bend the shield braining / shield foil to approx. 90°.
4. Push clamping ring (2) up to the shield braid / shield foil and wrap the
5. Assemble screw socket (4) on the housing.
6. Insert the clamping ring (2) in the screw socket (4) such that the torque
7. Screw the nut (1) to the screw socket (4).
Printed in the Federal Republic of Germany
02/02/2016
braiding back around the clamping ring (2), such that the braiding goes
around the inner O-ring (3), and is not above the cylindrical part or the torque
supports.
supports fit in the slots in the screw socket (4).
TR - ECE - BA - DGB - 0038 - 05
1
2
3
4
 TR-Electronic GmbH 2006, All Rights Reserved
Page 85 of 112

Werbung

loading