Herunterladen Inhalt Inhalt Diese Seite drucken

General Setup - Mettler Toledo M400 Quick Setup”-Anleitung

Vorschau ausblenden Andere Handbücher für M400:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23
7

General Setup

Besides the on-site operation you can configure the new M400 2-wire transmitter either via a
configuration tool, an asset-management-tool or via a HART handheld terminal.
Prerequisite: The new M400 2-wire transmitter and the sensor are mounted and electrically
Configuration tool or asset-management tool
h
Note: The DD for configuration tools PDM and AMS. You can download the DD via the internet:
"www.mt.com/m400-downloads".
For steps 1 to 5 and step 13 refer to the documentation of the tool.
1. Install configuration tool e.g. PDM or AMS.
2. Install DD for HART interface.
3. Update device catalog.
4. Build up connection. Check COM port settings if necessary.
5. Load configuration from device.
6. Set Tag or / and Long Tag.
Menu path: Device Setup > HART Setup
7. Set Date and Time. Set the time in the 24 hour format. The time format cannot be
changed. Menu path: Device Setup > System
8. Set range of the analog output signal.
Menu path: Detailed setup > Analog Output
• URV (Upper Range Value) and LRV (Lower Range Value): The values can be changed
to the current measurement range. The values have to be within the measurement limits
of the sensor.
• USL (Upper Sensor Limit) and LSL (Lower Sensor Limit): The limits are defined by the
sensor and cannot be changed.
9. Define the process variables PV, SV, TV and QV
Menu path: Device Setup > Measurements > Unit Setup
connected.
en
41

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis