Herunterladen Diese Seite drucken

Assembling The Synchronisation Shaft (With Protective Tube) - RK Rose+Krieger RK MonoLine R Montageanleitung

Lineareinheit
Vorschau ausblenden Andere Handbücher für RK MonoLine R:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.4.2.2

Assembling the synchronisation shaft (with protective tube)

Applicable to
Assembling the intermediate plate
Fig. 25: Assembling the intermediate
plate
14.10.2021
Assembling optional modules > Assembling the synchronisation shaft
Size
40
60, 80
120
ð The synchronisation shaft is assembled.
Version
Size
Personnel:
Protective equipment:
Prerequisites:
n
The electric gear unit and/or motor (if available) are secured
against restarting.
Linear units to be connected must be fixed in the substrate.
n
The synchronisation shaft for the RK MonoLine Z
60 and Z 80 does not require the first step because
it is not equipped with an intermediate plate.
1.
Place the intermediate plate (Fig. 25/1) on the pulley box
(Fig. 25/2) of both linear units.
2.
Tighten 4 screws each (Fig. 25/3), alternating diagonally:
Size
40
120
Linear unit RK MonoLine R/RK MonoLine Z
Screw size
M3
M6
M8
RK MonoLine Z
40/60/80/120
n
Assembly staff
n
Protective clothing
n
Protective gloves
n
Safety shoes
Screw size
M5
M8
Assembly
Tightening torque [Nm]
1.4
10.5
25
Tightening torque [Nm]
4
25
103

Werbung

Kapitel

loading

Diese Anleitung auch für:

Rk monoline z