Herunterladen Inhalt Inhalt Diese Seite drucken

Mettler Toledo IND780 Installationsanleitung Seite 62

Vorschau ausblenden Andere Handbücher für IND780:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 197
10. Slide the compression screw over the cable and up over the frayed wire and foil. Use wrenches
11. Wrap the ground strap around the cable next to the gland, slide a band clamp over the strap
12. Install the gland into the terminal. Pass the outer drain and the ground strap through the
2-38
METTLER TOLEDO IND780 Installation Guide
Foil
Figure 2-60: Foil Cut Back and Folded Over Ferrule
to tighten it into the body of the gland.
Compression
screw
Figure 2-61: Compression Screw Installed
and tighten it down.
Grounding Strap
Figure 2-62: Ground Strap and Clamp Installed
grounding fixture on the enclosure. Do not cut the ground strap: it must form a continuous
connection from the cable gland through the terminal enclosure grounding fixture to the ground.
Band Clamp
64057253
|
14
|
08/2014

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis