10. Slide the compression screw over the cable and up over the frayed wire and foil. Use wrenches
11. Wrap the ground strap around the cable next to the gland, slide a band clamp over the strap
12. Install the gland into the terminal. Pass the outer drain and the ground strap through the
2-38
METTLER TOLEDO IND780 Installation Guide
Foil
Figure 2-60: Foil Cut Back and Folded Over Ferrule
to tighten it into the body of the gland.
Compression
screw
Figure 2-61: Compression Screw Installed
and tighten it down.
Grounding Strap
Figure 2-62: Ground Strap and Clamp Installed
grounding fixture on the enclosure. Do not cut the ground strap: it must form a continuous
connection from the cable gland through the terminal enclosure grounding fixture to the ground.
Band Clamp
64057253
|
14
|
08/2014