4.12.2 Operating the lift mechanism with the Multi Pilot
Lifting and lowering
Requirements
– To prepare the truck for operation, (see
"Preparing the truck for operation" on
page 71)
Procedure
• Pull the Multi-Pilot (61) in direction H to raise
the load.
• Push the Multi Pilot (61) in direction S to lower
the load.
The load is now raised / lowered.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
Tilting the mast forward / backward
Requirements
– Truck prepared for operation, (see "Preparing
the truck for operation" on page 71).
Procedure
• Push the Multi-Pilot lever (61) in direction V to
tilt the mast forward.
• Push the Multi-Pilot lever (61) in direction R to
tilt the mast back.
The mast is now tilted back / forward.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
S
V
R
61
H
61
87