Herunterladen Inhalt Inhalt Diese Seite drucken

Switching On The Main Switch; Operation; Inspections To Be Performed Before Starting The Engine - probst POWER PLAN PP Bedienungsanleitung

Screeding machine
Inhaltsverzeichnis

Werbung

Operating instructions
PP
5.5

Operation

5.5.1

Inspections to be performed before starting the engine

Daily, before starting the machine for the first time:
Switch on the main switch. See "Main switch".
Perform the daily inspections. See "Daily inspections".
Visually check the machine for damage, loose parts and oil, fuel and coolant leaks.
Checking the oil pressure
37 / 70
Operating the machine
V1
Switching off the main switch
2. Turn the lever (2) anticlockwise
until it is in position (3) and
remove.

Switching on the main switch

3. Insert the lever in position (3) and
turn clockwise.
4. Flip back the headlight (1).
The oil pressure control light (1) must
be illuminated when the ignition switch
is set to I. See "Starting the engine".
When the engine is running, the oil
pressure control light must extinguish.
If it does not, there is a fault.
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis