Instructions for Stainless Steel Vertical Column Installation
GB
GB
Assembly Instructions
2.5. Steles/Pylons
For pylons type 1, stele type 2 and type 3
Please remove the rear inspection door on
the stele/pylon by opening the cylinder lock
at the top end. Guide the connection cables
through the base plate, prior to screwing the
stele/pylon to the foundation. Use hex screws
and plugs, stud bolts or stay bolts to fix the
stele/pylon to the concrete foundation (see
chapter "1. Foundation sketch" on page 31).
We recommend using screws etc. with a 12 mm
diameter and a length of 180 mm minimum.
Important! Please adhere to the torque
indication for tightening as provided by the
screw manufacturer.
Please note: These parts are not included in the
box.
Connect the pre-installed Behnke devices
inside the stele/pylon to the infrastructure
on site (cf. included manual for the Behnke
devices). Test the functioning of the Behnke
devices.
37
*
Put the inspection door back in position
and lock the cylinder lock.
Please keep a note of the key numbers for
the cylinder locks controlling the inspection
door inside the stele/pylon and (where
available) the letterbox door inside the letterbox
for possible replacement orders at a later stage.
Attached to these instructions, please find a
detachable list that you can give the customer.
For steles and pylons with letterbox, please
cf. page 39 no. 3.
* Where the installation is not level, this may
lead to the column body being warped, which
then may result in problems concerning the
columns' waterproofness.