Instructions for Stainless Steel Vertical Column Installation
GB
GB
Assembly Instructions
2.3. Column Series 50
For columns 50-5501; 50-5502; 50-5503; 50-5504
Please ensure that the column and the Series 50 intercom station you wish to install are compatible
to each other prior to installation.
*
35
Remove the rear cover from the Series 50
column (DB 703 coated) by loosening the four
screws to the back of the cover. Guide the
connection cables through the column foot,
prior to screwing the column to the foundation.
Use hex screws and plugs, stud bolts or stay
bolts to fix the Series 50 bolt to the concrete
foundation (see chapter "1. Foundation sketch"
on page 31). We recommend using screws
etc. with a 10mm diameter and a length of 180
mm minimum.
Important! Please adhere to the torque
indication for tightening as provided by the
screw manufacturer.
Please note: These parts are not included in the
box.
Install the Series 50 door intercom station
and connect it to the infrastructure on site
(cf. included manual for Series 20/3050 door
intercom stations). Test the door intercom
station.
Put the rear cover back and fix it with the
screws previously removed in step 1.
* Where the installation is not level, this may
lead to the column body being warped, which
then may result in problems concerning the
columns' waterproofness.
www.behnke-online.de