Herunterladen Inhalt Inhalt Diese Seite drucken

Personnel Qualification; Obligations - TR-Electronic LMRS 27 475 Gesamt-Bedienungsanleitung

Linear encoder magnetostriktiv
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.8 Personnel qualification; obligations

 All work on the measuring system must only be carried out by qualified personnel.
Qualified personnel includes persons, who, through their training, experience and
instruction, as well as their knowledge of the relevant standards, provisions,
accident prevention regulations and operating conditions, have been authorized
by the persons responsible for the system to carry out the required work and are
able to recognize and avoid potential hazards.
 The definition of "Qualified Personnel" also includes an understanding of the
standards VDE 0105-100 and IEC 364 (source: e.g. Beuth Verlag GmbH, VDE-
Verlag GmbH).
 Define clear rules of responsibilities for the assembly, installation, start-up and
operation. The obligation exists to provide supervision for trainee personnel !
Printed in the Federal Republic of Germany
03/17/2021
TR-ELA-BA-DGB-0004 v16
 TR-Electronic GmbH 2007, All Rights Reserved
Page 37 of 51

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis