Hem / Piping assembly
• Upper hem / piping guide
– Insert fastening screw into the thread insert with approx. two turns (Abb. D).
– Open roller clamping lever (24)
– Insert pin on the hem /piping guide into the pin positions and slide towards the fastening screw (Fig. E).
– Tighten fastening screw (Fig. F)
– Check: Align the hem /piping guide parallel to the lower guide plate. Close roller clamping lever (24). The two
material guide rollers (17) must touch one another (Fig. G).
(Fig. D)
• Welding nozzle
– Slide fastening clip over heating element tube (26) (Abb. H).
– Clamp welding nozzle (7) with fastening clip onto heating element tube (26) and insert fastening screw
(Abb. I).
– Tightly fastening screw slightly so that the welding nozzle (7) can still be turned slightly (Abb. J).
230
Connect hot.air welder to nominal voltage. Main switch ON
400
– Press the drive button
The pressure rollers (9/10) are closed by pressing the e-Drive
– Move welding nozzle (7) into the welding position using the nozzle swivel lever (12) (see section on
welding nozzle position). Align welding nozzle (7) symmetrically between the pressure rollers (9 / 10).
WARNING: The welding nozzle (7) must not touch the pressure rollers (9 / 10).
The nozzle position can be set using the distance adjustment screw (11) (Abb. L).
– Tighten fastening screw (Abb. K).
– Swivel welding nozzle (7) into the waiting position (see section on welding nozzle position).
– Pressing the e-Drive
the E-Drive
26
(Fig. H)
11
(Fig. L)
54
(Fig. E)
to let the task symbol
switches on the drive and the pressure rollers (9 / 10) begin to turn. Pressing
again switches off the drive and the pressure rollers (9 / 10) open.
(Fig. I)
(Fig. F)
ON
appear on the display.
.
7
(Fig. J)
(Fig. G)
10
7
9
(Fig. K)