Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Pressure Pipe - Kessel Aqualift F XL 200 Mono Einbau- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5.3
Connecting the ventilation pipe
Saw off the socket for the ventilation pipe (1) at the cut-
ting edge made.
Connect the ventilation pipe to the vent connection (1).
Connections and clamps should have sound-reducing
properties.
Route a separate ventilation pipe to above the roof in
accordance with EN 12056-4.
5.4

Connecting the pressure pipe

Fitting made of polymer
If necessary, install shut-off valve (1) (option).
Connect the pressure pipe (2) either vertically at the out-
let connection (3), or horizontally at the shut-off valve (1).
Fitting made of grey iron
Recommendation:
Pumping height > 5m and pumping capacity > 20m³/h
Install the fitting as illustrated; tighten all threaded fasten-
ers finger-tight initially.
Backflow preventer (6)
Y-pipe (5)
Shut-off valve (1)
Note the screw lengths!
Screws (7) = 40 mm
Screws (4) = 65 mm
4 threaded fasteners are used for each flange.
Tighten all threaded joints, starting from the top down.
Connect the pressure pipe (2) (flexible connection) to the
outlet connection (3).
28 / 108
Lifting station/Installation and operating instructions
010-907

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis