Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparations - WIKA UTN-EX Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.1 Mounting preparations

Ensure the sealing surface of the container or the BGU is clean
and has no mechanical damage.
5.2 Mounting
Observe the torque values of screws specified in pipefitting work.
Install the bypass level indicator without tension.
In the selection of the mounting material (sealings, screws, wash-
ers and nuts), take the process conditions into account.
The suitability of the sealing must be specified with regard to the
medium and its vapours.
Figure 2: Mounting UTN
In addition, ensure it has corresponding corrosion resistance.
The top-mounted level gauge is mounted in a vertical position above the
vessel to be monitored using the process connections provided. Seals,
screws, washers and nuts suitable for the process connection must be
used for mounting.
KSR KUEBLER Operating instructions Top-mounted level gauge UTN-EX
15

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis