Herunterladen Inhalt Inhalt Diese Seite drucken

Throttle Cable Inspection And Adjustment - Yamaha WaveRunner Gp1200R Wartungshandbuch

Inhaltsverzeichnis

Werbung

INSP
ADJ
CONTROL SYSTEM
WARNING
The cable joint must be screwed in more
than 8 mm (0.31 in).
Connect the cable joint and tighten the
locknut.
Locknut:
6 Nm (0.6 m • kgf, 4.3 ft • lb)
NOTE:
If the steering cable cannot be properly
adjusted at the steering column side, make
sure the steering cable at the jet pump side
is set to the specified length. Refer to
"REMOTE CONTROL CABLES AND SPEED
SENSOR LEAD" in chapter 8.

Throttle cable inspection and adjustment

NOTE:
Before adjusting the throttle lever free play,
adjust the trolling speed.
1. Measure:
Throttle lever free play a
Out of specification → Adjust.
Throttle lever free play:
4 ~ 7 mm (0.16 ~ 0.28 in)
2. Adjust:
Throttle lever free play
Adjustment steps:
Loosen the locknut 1.
Turn the adjuster 2 in or out until the
specified free play is obtained.
Turn in
Turn out
Tighten the locknut.
3-3
Free play is increased.
Free play is decreased.
E

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis