Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Check-Up; Hot Water - La Cimbali S39 Dolcevita 2 Gebrauch Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 89
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
COFFEE CIRCUIT / MILK CIRCUIT
Keep the coffee circuit wash key (26)

HOT WATER

Continuously dispense hot water until at least 2 liters of water have been dispensed.
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
02_S39DV2.indd 5

5. Installation Check-up

pressed for a few seconds.
5 EN
18/06/2014 15:15:26

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis