Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting External Cover - Maico PushPull PP 45 RHK Montageanleitung

Rohbau
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.2

Mounting external cover

Only mount external cover once the
i
external plastering is complete.
Formation of surface rust: External
i
factors (e.g. air containing sulphur
dioxide or salt, dust containing iron etc.)
may cause surface rust to form on stain-
less steel. We recommend thoroughly
cleaning unpainted stainless steel exter-
nal covers before mounting (remove
dust and finger-prints) and rub in a little
oil (e.g. care oil for stainless steel).
Mounting PP 45 AK, PP 45 AE and PP 45 AW
– once external wall is fully plastered –
Drilling distances for external cover
PP 45 AE (stainless steel ) and
PP 45 AW (white)
Drilling distances for external cover
PP 45 AK (plastic)
9 Mounting the wall sleeve and external cover | UK
Mounting
! CAUTION
1. Once the external plastering is complete,
remove the plaster protective cover.
2. Take front cover [F] off housing [G] of
external cover.
3. Align housing [G] horizontally and centred
with wall sleeve, mark 4 fixing holes,
position dowels and screw down housing
to external wall with 4 screws. Suitable
mounting material is to be supplied by the
customer.
4. Seal bottom third of spaces between wall
sleeve and housing [G] with permanently
elastic and weatherproof sealant e.g.
sealing strips [S1]) (silicone).
5. Press front cover [F] onto housing [G] so
it engages all the way round. Also secure
stainless steel front cover with a screw.
6. Seal front cover to external wall with per-
manently elastic and weatherproof sealant
 Arrows [S2]. Suitable sealing material is
to be supplied by the customer.
Exercise caution when handling
housing parts with sharp edges,
e.g. stainless steel external covers
 Wear protective gloves.
PP 45 AK
PP 45 AK
29

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis