Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric PQHY-P400 Installationshandbuch Seite 2

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 19
5
[Fig. 5.0.1]
= <
40°
= >
8 m
6
[Fig. 6.1.1]
<A>
990
45
900
C
A
<B>
45
C
45
<A> Side-by-side installation
<B> Back-to-back installation
A Heat exchanger unit
B Compressor unit
C 4-ø14 (Anchoring hole)
D (Top view)
*1
Select an installation site that is level and free from vibrations so that the side
panels of the units do not rub against each other.
*2
Select an installation site that allows the fixation of the units to the floor.
[Fig. 6.1.2]
E
F
2
= >
8 m
6.1
1990
(10) *1
990
45 45
900
45
B
D
990
C
900
45
A
B
900
45
990
D
E Anti-vibration pad etc.
F Concrete base
[Fig. 6.2.1]
<A>
A
400
<B>
C
<A> Side-by-side installation
<B> Back-to-back installation
A Piping space (for side piping)
B Heat exchanger unit
C Compressor unit
D Service space (front side)
E (Top view)
F Piping space
*1
Select an installation site that is level and free from vibrations so that the side
panels of the units do not rub against each other.
*2
Select an installation site that allows the fixation of the units to the floor.
6.2
(10) *1
B
D
990
E
400
990
D
B
F
C
D
400
990
E
C
990
A
400

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

500ysgm-a

Inhaltsverzeichnis