Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Operation; Installation - Bartscher AT 110 Original-Gebrauchsanleitung

3 x 1/2 gn
Vorschau ausblenden Andere Handbücher für AT 110:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5. Installation and operation

5.1 Installation

CAUTION!
Any installation, connection and maintenance work related to the device must
be performed by the qualified and certified technician in accordance with the
applicable international, national and local regulations.
Positioning
Discard the complete packing material after unpacking the device.
Place the device on an even, stable, dry and waterproof and heat-resistent surface.
Never place the device on an inflammable surface.
Never place the device in wet or damp locations.
Place the device so that it is easily accessible, leaving enough space to freely service
the device and ensure appropriate air circulation.
Never place the device directly against walls, low walls, furniture or other objects
which are made of flammable material. Keep a distance of at least 10 cm at the
sides and at the rear from walls and other objects. Take into account the applicable
fire protection regulations.
If keeping the above mentioned distance is impossible, apply appropriate safety
measures (e.g. heat-resistant foil), which will ensure keeping the wall's temperature
within the safe range.
NOTE!
The device is not a built-in device and should not be installed as such!
- 29 -

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

120789

Inhaltsverzeichnis