Body Shower Connection/Installation of rear levelling
section/Sealing the rear levelling section
10 Secure left and right rails with Allen screws
(T-wrench SW4).
11 Connect left body shower: a
12 Connect right body shower: b
13 Secure connections with threaded pipe clamps.
14 Loosen and remove clamp clip i.
15 Degrease sealing ring in the seam area with spirit.
16 Rear levelling section: Degrease bent inner surface with
spirit, apply silicone.
17 Push on levelling section in the middle.
18 Refit clamp clip i.
19 Apply silicone on the inside as shown in the right figure.
64
Rail
left
a
b
Silicone on levelling section
Apply silicone to the inside
Rail
right
Rear levelling section