Herunterladen Inhalt Inhalt Diese Seite drucken

Stahl 8150/5 Serie Betriebsanleitung Seite 41

Steuer- und verteilerkasten
Vorschau ausblenden Andere Handbücher für 8150/5 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PE/PA connection for conductor cross-section up to 25 mm
Assembly 0245:
Internal connection
Insert the earth bolt (1) and the sealing ring (1a) into a suitable drilled hole in the enclosure
wall (2) and fasten them using a hexagon nut (3) (tightening torque: 23 Nm).
Slide the internal PE cable lug (4) onto the earth bolt (1) and fasten them using a split
washer (5a) and hexagon nut (5) (tightening torque: 4 Nm without a connection,
16 Nm with a connection).
Slide the external PE cable lug (6) onto the earth bolt (1) and fasten them using a split
washer (7a) and hexagon nut (7) (tightening torque: 4 Nm without a connection,
16 Nm with a connection).
PE/PA connection for conductor cross-section from 4 to 120 mm
Assembly 0238:
Internal connection
Insert the earth bolt (1) and the sealing ring (1a) into a suitable drilled hole in the enclosure
wall (2) and fasten them using a hexagon nut (3) (tightening torque: 50 Nm).
Slide the internal PE cable lug (4) onto the earth bolt (1) and fasten them using a split
washer (5a) and screw (5) (tightening torque: 4 Nm without a connection,
16 Nm with a connection).
Slide the external PE cable lug (6) onto the earth bolt (1) and fasten them using a split
washer (7a) and hexagon nut (7) (tightening torque: 4 Nm without a connection,
16 Nm with a connection).
202162 / 815060300030
2023-03-23·BA00·III·en·03
1a
5a
2
3
5
4
2
5
4
3
5a
Mounting and Installation
2
External connection
7
7a
6
1
07855E00
2
External connection
7
7a
1
6
1a
12780E00
Control and distribution panel
Series 8150/5
DE
EN
FR
IT
ES
RU
NL
DK
SE
FI
PT
GR
PL
CZ
SK
HU
SL
RO
BG
LV
LT
EE
CH
KR
CN
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis