Remaining risk factors

It is important to ensure that each machine has remaining risks.
In the execution of all work (even the simplest) greatest attention is
required. A safe working depends on you!
Even if the machine is used as required it is still impossible to eliminate certain residual risk factors
totally. The following hazards may arise in connection with the machine´s construction and design:
Despite of correct and proper use and maintenance there remain some residual risk factors:
Risk of injury to the hands / fingers by the rotating tool during operation.
Risk of injury due to sharp knives.
Risk of injury: hair and loose clothing, etc. can be captured and wound up! Safety
regulations must be observed with regard to clothing.
Risk of injury due to contact with live electrical components.
Risk of injury to the eye by flying debris, even with safety goggles.
Risk of injury to the hearing by prolonged labor without hearing protection.
These risk factors can be minimized through obeying all security and operation instructions, proper
machine maintenance, proficient and appropriate operation by persons with technical knowledge
and experience.
This machine produces an electromagnetic field during operation. This field
may under some circumstances interfere with active or passive medical
implants. To reduce the risk of serious or fatal injury, we recommend persons
with medical implants to consult their physician and the medical implant
manufacturer before operating this machine!
13

ASSEMBLY

13.1

Preparatory activities

13.1.1 Delivery content

Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please understand
that later claims cannot be accepted anymore.

13.1.2 Workplace requirements

The workplace has to fulfill the requirements.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.

13.1.3 Transport

The machine can be transported in package with a forklift.
The machine is very heavy. The machine shall be lifted from crate with a suitable lifting device only
that is certified to be able to carry the machines load.
The lifting and transportation of the machine must only be carried out by qualified
staff and must be carried out with appropriate equipment.
Note that lifting equipment used (crane, forklift, sling, etc.) must be in perfect condition.
To maneuver the machine in the packaging can also a pallet jack or a forklift be used.
HOLZMANN MASCHINEN GmbH
All manuals and user guides at all-guides.com
www.holzmann-maschinen.at
WARNING
WARNING
W A R N I N G
ASSEMBLY
23
HMS 700 / HMS 1000

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Hms 1000

Inhaltsverzeichnis