13 Inspection and maintenance
13 Inspection and maintenance
The equipment is subject to pressure!
▶ Risk of severe injury or death.
Depressurize the plant.
●
Completely drain the plant.
●
Use of incorrect spare parts!
▶ Damage to the GEMÜ product.
▶ Manufacturer liability and guarantee will be void.
Use only genuine parts from GEMÜ.
●
Hot plant components!
▶ Risk of burns.
Only work on plant that has cooled
●
down.
Risk of crushing!
▶ Risk of severe injury!
Before performing any work on the
●
GEMÜ product, depressurize the plant.
Requirements for tube lines used!
▶ Use tube lines suitable for the application, see manufac-
turer's information.
Only use undamaged tube lines.
●
Lay tube lines professionally!
▶ Lay tube lines professionally and do not bend them below
the minimum bending radius, see manufacturer's inform-
ation.
Do not kink or twist the tube lines.
●
Exceptional maintenance work!
▶ Damage to the GEMÜ product.
Any maintenance work and repairs not described in these
●
operating instructions must not be performed without
consulting the manufacturer first.
The operator must carry out regular visual examination of the
GEMÜ products depending on the operating conditions and
the potential danger in order to prevent leakage and damage.
GEMÜ Q50 eSyStep
WARNING
CAUTION
CAUTION
CAUTION
NOTICE
NOTICE
NOTICE
The product also must be disassembled and checked for
wear in the corresponding intervals.
1. Have servicing and maintenance work performed by
trained personnel.
2. Wear appropriate protective gear as specified in plant op-
erator's guidelines.
3. Shut off plant or plant component.
4. Secure plant or plant component against recommission-
ing.
5. Depressurize the plant or plant component.
6. Actuate GEMÜ products which are always in the same po-
sition four times a year.
7. If necessary, the end position counter User can be reset
after maintenance or other changes under parameter
Cycle Counter.
13.1 Spare parts
Item
A
Actuator
1
Tube holder
2
Compressor
104 / 112
A
2
1
Name
Order designation
-
... (OD 3/4")
... (OD 7/8")
... (ID 1/2")
www.gemu-group.com