Herunterladen Inhalt Inhalt Diese Seite drucken

Connection Diagram; Displays And Controls - Porsche Home Energy Manager Anleitung

Vorschau ausblenden Andere Handbücher für Home Energy Manager:
Inhaltsverzeichnis

Werbung

Overview

Connection diagram

Fig. 17: Wiring Diagrams
L1/ L2/ L3
Up to 3 phases
N/PEN
Neutral wire
100-240 VAC
Input voltage
24 VDC
Output voltage
NOTICE
The allocation of phases L1 - L3 may differ from the
illustration g (Fig. 17) shown. Please check the phase
assignment at your house connection.
44

Displays and controls

Fig. 18: Displays and controls
Displays
Description
LED lights up green: Energy man-
ager is ready for operation.
Status
On/Off
LED lights up green: Internet con-
nection established
Internet
status
LED flashes blue. Hotspot mode, no
client connected
WiFi status
LED lights up blue: Hotspot mode,
at least one client connected
LED flashes green: Client mode, no
WiFi connection available
Displays
Description
LED lights up green: Client mode,
WiFi connection available
LED lights up or flashes blue: Paral-
lel operation in client mode is possi-
ble.
LED flashes yellow: WiFi connection
via WPS
LED flashes green Searching for PLC
network connection.
Status of
LED lights up green: PLC network
Powerline
connection in place.
Communi-
LED flashes blue. Activating DHCP.
cation
(PLC) net-
LED lights up blue: DHCP (for PLC
work
only) is active and PLC network
connection is in place.
LED lights up green: Network con-
nection in place.
Ethernet
status
On: LED lights up green during com-
munication (currently not assigned).
RS485/CA
N status
LED flashes or lights up yellow: Fault
present
Fault sta-
LED lights up red: Functions restric-
tus
ted

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis