Herunterladen Inhalt Inhalt Diese Seite drucken

How To Install; Installing The 2-In-1 Charging & Storage Mount - Xiaomi G9 Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

How to Install

Installing the Accessories onto the Vacuum Cleaner
Insert until it clicks into place
Note: Mini electric brush should not be used with the extension rod.
6
Insert until it clicks into place
Installing the 2-in-1 Charging & Storage Mount
1. The 2-in-1 charging & storage mount should be installed in a
cool, dry place with an electrical outlet nearby. Prior to installing,
ensure that there are not any wires or pipes in the space directly
behind where the mount will be installed.
2. The bottom of the mounting template sticker should be level
and at least 1.03 m from the ground, and its top should have at
least 30 cm of clearance above it.
Extended Dock
You can simultaneously charge the replaceable
battery* when charging the vacuum cleaner on the
2-in-1 charging & storage mount.
Extended Dock Charging Plate
Mounting Template
Screw
Wall Plug
Sticker
* The replaceable battery is not included and purchased separately.
3. Use a power drill with an 8 mm drill bit to drill a hole into each
hole marker on the mounting template sticker, then insert a wall
plug into each hole.
4. Align the mounting holes on the 2-in-1 charging & storage mount
to the holes on the wall, then attach the mount to the wall using
the included screws.
30 cm
1.03 m
Recommended Height: At least 1.03 meters from the ground
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mjscxcq1t

Inhaltsverzeichnis