Herunterladen Inhalt Inhalt Diese Seite drucken

Service Hoses Connection; Use Of Oil And Uv Dye Bottles - Bosch ACS 763 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
| 56 | ACS 763/863 | Initial settings
5.4

Service hoses connection

Connect the service hoses included in the supply with
the high pressure and low pressure (HP and LP) quick
connections.
Fig. 12:
Service hoses connection (HP and LP)
1 Connection for service hose (high pressure)
2 Connection for service hose (low pressure)
i
The quick connections are specifically designed
for refrigerant management according to the SAE
standard.
1. Lubricate the o-rings of the service hoses (HP and
LP) with an oil film.
2. Screw the high pressure service hose (red) to the
HP connection on the station.
3. Screw the low pressure service hose (blue) to the
LP connection on the station.
4. Tighten both service hoses with a tightening torque
of 7.9 Nm.
i
If not used, service hoses can be wound on the
back of the station.
5.5

Use of oil and UV dye bottles

!
Only use UV contrast liquids and oils that are ap-
proved by the vehicle manufacturer. This prevents
chemical incompatibility with the station internal
components.
In the event of problems and failures due to
non-approved liquids, the warranty will be void.
i
The following procedure is necessary to minimize
the amount of air in the bottles.
1. Unscrew the "PAG", "POE", "UV Dye" bottle covers
and remove them with the 3 pistons.
2. Fill the 3 bottles with compressor oil for PAG and
POE or UV dye at maximum to the "MAX FILL" line.
3. Lubricate with an oil film the o-rings of the 3 pis-
tons to reduce friction on the bottles.
|
1 689 989 610
2020-12-01
Fig. 13:
Bottles filling
4. Insert the 3 pistons into the appropriate bottles
1
as shown in the figure holding the covers and the
2
pistons inclined until the pistons reach the level of
the liquid.
5. Turn the 3 covers in the vertical position and slowly
push them down into the bottles and screw them
in.
4
3
Fig. 14:
Position of bottles
1 UV dye bottle
2 New oil bottle (POE)
3 New oil bottle (PAG)
4 Exhausted oil bottle
6. Place the bottles in the appropriate front area of
the station in the order shown in the figure. To se-
cure them, make sure that each of them is aligned
with the respective bracket/fitting and have a slight
pressure in the straight direction to the station.
1
2
Robert Bosch GmbH

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Acs 863Acs 863-oe

Inhaltsverzeichnis