Herunterladen Inhalt Inhalt Diese Seite drucken

Charging The Battery; Installing The Battery - Toro Z Master Professional 7000-Serie Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Z Master Professional 7000-Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Charging the Battery

WARNING
Charging the battery produces gasses that
can explode.
Never smoke near the battery and keep sparks
and flames away from the battery.
Important:
Always keep the battery fully charged
(1.265 specific gravity). This is especially
important to prevent battery damage when the
temperature is below 0°C (32°F).
1.
Remove the battery from the chassis; refer to
Removing the Battery (page
2.
Charge the battery for 10 to 15 minutes at 25 to
30 A or for 30 minutes at 10 A.
Note:
Do not overcharge the battery.
3.
When the battery is fully charged, unplug
the charger from the electrical outlet, then
disconnect the charger leads from the battery
posts
(Figure
69).
4.
Install the battery in the machine and connect
the battery cables; refer to
(page
53).
Note:
Do not run the machine with the battery
disconnected; electrical damage may occur.
Figure 69
1. Positive (+) battery post
2. Negative (–) battery post
52).

Installing the Battery

g000960
3. Red (+) charger lead
4. Black (–) charger lead
Installing the Battery
Note:
Position the battery in the tray with the terminal
posts opposite from the hydraulic tank
53
(Figure
Figure 70
70).
g032751

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis