Herunterladen Inhalt Inhalt Diese Seite drucken

probst HVZ-ECO Betriebsanleitung Seite 87

Hydraulische verlegezange für den universellen baggereinsatz
Vorschau ausblenden Andere Handbücher für HVZ-ECO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation
Position the HVZ-ECO over the stone layer, which shall be gripped.
Turn the HVZ-ECO in such a way by means of the hydraulic rotator that it can be lowered over the stone layer
which can be gripped.
Swivel the HVZ-ECO in such a way, that the steel lamellas of the laying main clamping touch the stones.
Swivel further in such a way that the HVZ-ECO is in approximately centrically aligned to the paving stone layer
which can be gripped toward the side clamping.
Lower the HVZ-ECO, until the supporting feet of the HVZ-ECO affect the stone surfaces. Do not continue to
lower afterwards! The cross beam may not under any circumstances the HVZ-ECO essay be affected and thus
pressure from above on the clip be exercised (by the boom of the support frame).
Hydraulic control lever on " Position 1" operate, so for a long time on this position hold, until the following
movements ran off:
 main clamping closes
 main clamping opens slightly
 side clamping closes
 side clamping closes
 side clamping opens
Explanation: Positions of the control lever
Pos.1 : gripping, laying, reset
Pos. 0: zero position
Pos.3: back movement (ex.: a bend of cycle)
During appropriate use and attitude of positioning adapters the stone situation palletized on so-called "cross
joint" is shifted by this course of motion automatically into the "running bond".
When releasing the hydraulic control lever and/or by leading back the control lever into the central position the
gripping trial can be broken off at each time. By a new movement of the control lever on "close" the operating
procedure will be continued at the stopped position. When moving control lever on "Position 1/open" the last
movement will be reset.
Lead back the hydraulic control lever after completely locked grab procedure (side clamping opens perfectly
and swivels completely upward) into the central position.
HVZ-ECO with the gripped layer of stones situation carefully raise and to the shifting place swivel.
Place the paving layer 5 cm in direction to the open laying ground until the rollers touch the already laid
paving stones.
Move the paving layer diagonally to the corner of the laying edge and take care of the correct connection to
the already laid paving stones.
HINT:
Don not try to „tip" the paving layers in side clamping direction with the already laid paving stones.
This is not possible, because the paving layers in the clamp are compressed and the already laid paving stones
are unconsolidated. It is better to either remove the "key-stones" before laying and later bring it back or lay
additional paving stones after the complete laying process.
By manipulation of the control lever on "open" and hold the control lever in this position few cm the main
clamping opened, the stone layer are thus released, so that them are put down into the facing bedding sand.
Move the control lever back into the central position.
The HVZ-ECO lifts up.
In freely hanging condition of the HVZ-ECO the control lever repeated on "open" operate and there so for a
long time hold, until the main clamping is completely opened and was driven out the pushing-off cylinders.
This manipulation can also take place, for saving time during the HVZ-ECO is moving back (in
HINT:
startposition) for a new gripping action of the next stone layer.
Now the lying cycle is finished, the device is ready for the admission of the next stone layer which can be
installed.
51400034
Fig. 3
Pos 2
Picture of control lever - excavator
V3
Pos. 0
Pos.1
35 / 41
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5140.0034

Inhaltsverzeichnis