Herunterladen Inhalt Inhalt Diese Seite drucken

Ceiling; Duct; Installation And Commissioning; Fan - Maico ECA 100 ipro Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8 Installation and commissioning

1. Make sure the housing has a level base.
2. Fit wall breakthrough or drill core hole. Min-
imum diameter, 105 mm.
Recommendation: Fit WH 100 wall sleeve.
Fit wall breakthrough with minimum diameter
115 mm.
Use ZM 11 mounting plate for rectangular
wall breakthroughs.
3. Lay power cable (recessed) up to place of in-
stallation, see above for spacing. Feed the
power cable at least 110 mm out from the
wall.

7.2 Ceiling

1. Perform installation preparations as described
in Chapter Wall [} 21].
NOTICE Danger of short-circuits and damage
to unit if condensation builds up in the fan
housing.
Thermally insulate ventilation ducts properly. Al-
low for a condensation drain or condensate col-
lector in the riser.

7.3 Duct

1. Deburr edges on the inside of the duct.
2. Perform installation preparations as described
in Chapter Wall [} 21].
8 Installation and commissioning

8.1 Fan

1. Unpack unit and take off cover.
22
2. To release the cover's locking hook, unlock
using a screwdriver.
3. Fit supplied foam strip centred in socket.
The foam strip must be fitted to the ECA
100 ipro H and KH, so that the units do not
draw in any unwanted air from outside.

8.2 Housing installation

NOTICE Damage to unit/functional problems
in the event of rubbing impeller.
Do not fit flange sleeve either twisted or crushed.
Make sure that the surface is flat.
When installing the FE 100/1 window in-
stallation kit or the ECA-DR spacing frame, see
the associated installation instructions at
www.maico-ventilatoren.com.
1. Insert housing into wall breakthrough/wall
sleeve (TOP).

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis