Herunterladen Inhalt Inhalt Diese Seite drucken

Safe And Correct Practices During Operation; Supply Air Intake Within The Living Area; Installation Preparations; Wall - Maico ECA 100 ipro Montageanleitung Und Betriebsanleitung

Kleinraumventilator
Vorschau ausblenden Andere Handbücher für ECA 100 ipro:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
6.4 Safe and correct practices during
operation
● Danger of injury. Do not insert any objects
in the unit.
● Danger from rotating impeller. Do not get
too close to the unit, to avoid hair, clothing
or jewellery being drawn into the unit.
● The unit is not intended to be used by
people whose physical, sensory or mental
capabilities are not sufficient for them to
understand and put into practice the safety
information provided in these instructions.
This limitation also applies to children.
The unit may however be safely used by
such persons if they are supervised by
someone responsible for their safety or if
they are instructed in a suitable way.
6.5 Supply air intake within the living
area
● The domestic air supply must be set-up so
that virtually no air can flow into the living
areas from the kitchen, bathroom and WC.
● A room from which the air has to be ex-
tracted must be fitted with an non-closable,
free supply air cross section of at least
150 cm², e.g. with door ventilation grille
MLK.
14

7. Installation preparations

7.1 Wall

The prescribed minimum distances
i
between the wall and the ceiling
shown in the figure must be observed.
 Make sure the housing has a level base.
 Fit wall breakthrough or drill core hole.
Minimum diameter, 105 mm.
Recommendation: Fit wall sleeve
i
WH 100.
Use mounting plate ZM 11 for
i
rectangular wall breakthroughs!
 Lay power cable (recessed) up to place of
installation, see above for spacing. Guide
the power cable at least 100 mm from
the wall.

7.2 Ceiling

Danger of short-circuits and
NOTICE
damage to unit if conden-
sation builds up in the fan
housing.
 Thermally insulate ventilation
ducts in professional manner.
 Allow for a condensation drain
or condensate collector in the
riser.
 Perform installation preparations as
described in Chapter 7.1.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis