Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli PLASTIC-STOP PLUS Bedienungs- Und Wartungsanleitung Seite 65

Mulcher
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Safety advice for maintenance
Maintenance work must be carried out with the work
vehicle on flat, compact ground, with the tractor en-
gine off, parking brake engaged, and ignition key re-
moved, and adopting all the necessary safety meas-
ures required to work safely.
Any maintenance operations that can be carried out
on the business premises come under the ordinary
Maintenance interval schedule
To guarantee constant, efficient and safe machine operation, ensure all the maintenance envisaged by the manufac-
turer is carried out.
Frequency
Component
Compacting roller
Hoeing shares
Every hour
Ridging shares
Pressure wheels
Lift frame
Every day
Warning and hazard plates
Pins for roll holder rollers
Every 25
hours
Pins for idle roller
Machine components
Every 50
hours
Nuts and bolts
Every 150
Tyres
hours
Tyre check
Check the tyres for wear and if they feature tears or signs
of ageing, they must be replaced.
Cleaning the work vehicle
Clean the work vehicle with a high-pressure water jet
and, if necessary, with approved detergents.
The liquid used for washing could be hazardous for the
environment due to the presence of pollutants such as
detergents, oils, etc., therefore do not simply dump the
English language
MAINTENANCE INFORMATION
maintenance envisaged in the instruction manual.
Special maintenance operations (non included in
this handbook) require a specialised workshop on
the premises which meets the requirements speci-
fied by the relative laws in force (appropriate equip-
ment suitably trained staff etc.); if you do not have a
compliant workshop, contact an authorised one.
Maintenance intervals
Type of work
Cleaning
Greasing
Inspection
Inspection
Greasing
Lubrication
Greasing
Tightening
Pressure check
Check tyre pressure and restore if necessary (see "Tech-
nical characteristics" schedule).
The pressure must be checked with the work vehicle
resting on the ground.
wastewater; dispose of it in suitable areas equipped with
separation devices for the pollutants.
Dry with compressed air and lubricate the components
shown (see "Lubrication points diagram").
25
Manual reference
Lubrication points diagram
Information and safety signs
Lubrication points diagram
Lubrication points diagram
Tyre check
Use and maintenance
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis