Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions: Temperature Sensor; Safety; Scope Of Supply; Tools Needed - Fronius Transpocket 1500 Erdstrom Serviceanleitung, Ersatzteilliste

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions: Temperature sensor

Safety

Scope of supply

The assembly "Temperature sensor" (43,0001,1084) comprises the following
component:
Item
(9)

Tools needed

Designation
- Manual torque screwdriver (1 to 6 Nm, 42,0411,0013)
- Bit insert TX 20, for torque screwdriver
Opening the
(34)
housing
Fig.1
Fig.2
Warning! Work performed incorrectly can cause serious injury and damage.
This modification may only be performed by suitably trained and skilled
electricians! Before opening up the machine, shift the mains switch to the "0"
position and unplug the machine from the mains!
Note! Follow the safety rules given in the Operating Instructions, especially the
section headed "Safety inspection".
Designation
Temperature sensor ........................................................................................... 1
(36)
(35)
(21)
(37)
- Take off the carrying strap
- Undo the 5x25-TX20 screw (34) on the
front of the housing
- Undo the 5x25-TX20 screw (35) on the
rear of the housing
- Carefully lift the housing box and
disconnect the "housing earth
conductor" (36)
- Remove the housing stiffening element
(21)
- Remove the board insulator (37)
85
N° of items

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis