Herunterladen Diese Seite drucken

Connection Of Lines; Start Up; Screw In Cartridge - BEKA HAMAX SYSTEM 2 Original - Betriebs- Und Montageanleitung

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.2

Connection of lines

Professional layout!
When using pipes, observe that they are clean, seamless and of precision steel!
Assemble the pipes professionally and free from distortion!
Provide a strain relief for the lubricant line at the latest 0.5 m after the device!
The lubricant line should be prefilled in order to avoid air inclusions!
Pay attention to pressure tightness of fittings!
All components must be approved for max. operating pressure (see chapter 1. "Technical data").
9.

Start up

9.1

Screw in cartridge

Ensure that only lubricants are used that are suitable both for the device and the machine to be lubricated and fulfill the
requirements of the respective operating conditions!
Observe the lubricant information of the machine manufacturer!
Observe the safety data sheet of the lubricant manufacturer!
The flow behavior of the lubricant changes with the operating temperature!
Ensure utmost cleanliness when changing the cartridge!
The O-rings (fig. 3, pos. 1 + 2) in the adapter must be lightly greased before assembly of the cartridge.
Fig. 3:
Remove the plug from the cartridge opening.
Push the grease 5 to 10 mm out of the cartridge (fig. 4) using the cartridge follow-up piston (fig. 3, pos. 3).
Remove redundant grease and dispose of it professionally.
Screw the cartridge hand tight into the adapter holder under light pressure.
Ventilate the device on initial installation (see chapter 9.3 "Ventilation of the device").
Make sure that no dirt can enter the suction area of the cartridge when screwing in the cartridge!
Caution!
© BEKA 2019 All rights reserved!
Fig. 4:
-40-

Werbung

Kapitel

Fehlerbehebung

loading