7.5.1
Permissible forces and torques on
the pump flanges
Fig. 13: Load case 16A, EN ISO 5199, Ap-
pendix B
80
Installation
r ≈ 2,5 * (d-2s)
5 x DN
Fig. 12: Settling section upstream and downstream of the pump
NOTICE
Avoid flow cavitation!
• A settling section must be provided upstream and downstream of the pump in the
form of a straight pipe. The length of the settling section must be at least 5 times
the nominal diameter of the pump flange.
ƒ
The pipes and pump must be free of mechanical stress when installed.
ƒ
The pipes must be fixed in such a way that the pump does not have to support the
weight of the pipes.
ƒ
Clean and flush the unit before connecting the pipes.
ƒ
The direction of flow must correspond with the direction arrow on the pump flange.
ƒ
The air vent valve at the lantern (Fig. I, Item 28) must always be pointing upwards if
the motor shaft is horizontal (Fig. 8). If the motor shaft is vertical, any orientation is
permitted. See also chapter "Permissible installation positions".
Pump suspended in pipe, case 16A (Fig. 13)
DN
Forces F [N]
F
F
F
X
Y
Z
Pressure and suction flange
450
525
425
32
550
625
500
40
750
825
675
50
925
1050
850
65
1125
1250
1025
80
1500
1675
1350
100
1775
1975
1600
125
Values in acc. with ISO/DIN 5199 – class II (2002) – Appendix B
Table 7: Permissible forces and torques on pump flanges in vertical pipe
Torques M [Nm]
Σ Forces F
M
M
X
Y
825
550
375
975
650
450
1300
700
500
1650
750
550
1975
800
575
2625
875
625
3100
1050
750
M
Σ Torques M
Z
425
800
525
950
575
1025
600
1100
650
1175
725
1300
950
1525