Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning, Switching On And Off; Commissioning; Switching On And Off - Sika E2 Betriebsanleitung

Digitalmanometer
Vorschau ausblenden Andere Handbücher für E2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

E2 / D2
5

Commissioning, switching on and off

The digital manometer E2 / D2 is supplied with batteries fitted. The device is ready for opera-
tion after it is switched on ( § 5.2).

5.1 Commissioning

Before switching on the E2 / D2 for first time and when making changes in the measurement
setup, follow the instructions below.
Check if
 all test setup components are connected to each other.
 all connections were made properly and are pressure-proof.

5.2 Switching on and off

Switch the E2 / D2 on and off with the ON/OFF button.
Switching on:
The device first performs a self-test and is subsequently in the measured value display.
 Briefly press the ON/OFF button.
 All segments of the digital display will appear
briefly.
 After that, the pressure range (FS) of the device
and the most recently used pressure unit are
displayed.
 The current setting of the automatic shut-off fol-
lows (

):
"

" = activated; "
 Finally, the serial number and the installed soft-
ware version of the device are displayed.
 The device is subsequently ready and displays the
current measurement values.
Switching off:
 Briefly press the ON/OFF button.
 The device is switched off and the display is blank.
Automatic shut-off:
With activated "

" function (
Technical changes reserved

" = deactivated.

), the device switches off after 5 min ( S. 40).
Commissioning, switching on and off
- 35 -

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

D2

Inhaltsverzeichnis