Tightening connection
Align the centers of the connecting pipes and tighten
the flare nut as far as possible with your fingers. Then
tighten the nut with a spanner and torque wrench as
shown in the figure.
CAUTION
• Do not apply excess torque. Otherwise, the nut
may crack depending on the conditions.
Outer dia. of copper pipe
Ø6.35 mm
Ø9.52 mm
Ø12.7 mm
• Tightening torque of flare pipe connections
Pressure of R410A becomes higher than that of R22.
(Approx. 1.6 times) Therefore, using a torque wrench,
tighten firmly the flare pipe connecting sections which
connect the indoor and outdoor
units up to the specified
tightening torque.
Incorrect connections may
cause not only a gas leakage,
but also a trouble of the
refrigeration cycle.
Half union
Externally
threaded side
Use a wrench to secure.
Outdoor
unit
A
10, 13
(with reducer) (with expander) (with expander)
3M26
16
10, 13
(with reducer) (with expander) (with expander) (with expander)
4M27
16
Downloaded from AC-Manual.com Manuals
Downloaded from
www.Manualslib.com
Tightening torque
14 to 18 (1.4 to 1.8 kgf•m)
33 to 42 (3.3 to 4.2 kgf•m)
50 to 62 (5.0 to 6.2 kgf•m)
Flare nut
Use a torque wrench to tighten.
4M27 only
Ø6.35
D
Ø9.52
Ø6.35
C
Ø9.52
Ø6.35
B
Ø9.52
Ø6.35
A
Ø12.7
Connectable capacity class
B
C
16
16
10, 13
10, 13
16
16
10, 13
10, 13
manuals search engine
After the piping has been connected to all indoor
unit(s), you can perform the air purge together at once.
AIR PURGE
Evacuate the air in the connecting pipes and in the
indoor unit using vacuum pump.
Do not use the refrigerant in the outdoor unit.
For details, see the manual of vacuum pump.
(Unit : N·m)
Use a vacuum pump
Be sure to use a vacuum pump with counter-flow
prevention function so that inside oil of the pump does
not flow backward into pipes of the air conditioner when
the pump stops. (If inside oil of the vacuum pump
enters into the air conditioner which adopts R410A, a
trouble of the refrigeration cycle may be caused.)
1. Connect the charge hose from the manifold valve to
the service port of the gas side packed valve.
2. Connect the charge hose to the port of vacuum pump.
3. Open fully the low pressure side handle of the gauge
Flare at
manifold valve.
indoor
unit side
4. Operate the vacuum pump to start for evacuating.
Perform evacuating for about 35 minutes if the piping
length is total 70 meters.
(25 minutes for total 50 meters)
(assuming a pump capacity of 27 liters per minute.)
Then confirm that the compound pressure gauge
Flare at
reading is –101 kPa ( –76 cmHg).
outdoor
unit side
5. Close the low pressure side valve handle of gauge
manifold.
Internally
6. Open fully the valve stem of the packed valves (both
threaded side
sides of Gas and Liquid).
7. Remove the charging hose from the service port.
8. Securely tighten the caps on the packed valves.
Compound pressure gauge
–101kPa (–76cmHg)
D UNIT
C UNIT
Packed valve
at liquid side
B UNIT
A UNIT
Indoor unit
D
Total
——
Packed valve handling precautions
45
——
• Open the valve stem all the way out ; do not try to
16
open it beyond the stopper.
52
• Securely tighten the valve stem cap in torque as follows:
10, 13
8
Evacuating
Pressure gauge
Manifold valve
Handle Lo
Handle Hi
(Keep full closed)
Charge hose
Charge hose
(For R410A only)
(For R410A only)
Vacuum pump adapter
for counter-flow prevention
(For R410A only)
Vacuum
pump
Service port
(Valve core (Setting pin))
Packed valve at gas side