The electric overload protection (automatic circuit breaker with K-feature) must be equipped with a 30 mA safety switch (FI or RCD).
Three-phase current: 400 V (3P + N + PE), 50 Hz
Hoist control and electric connections
The hoist control and the connections must be dimensioned according to the wiring diagram.
In control systems for three-phase operation, equipment must be provided so that it shuts down the power in case of an incorrect
phase sequence to prevent a mix-up of the direction of travel UP/DOWN.
Determining the required cable cross-section:
In Illustration 19 determine the cable cross-section required for the code letter.
Determine the code letter (e.g. 'C') using Illustration 20. On hoists with two speeds the maximum rope speed is the determining
factor.
X 300 P
X 400 P
X 500 P
X 520 P
L 500 P
X 600 P
X 620 P
X 820 P
X 1030 P
X 2050 P
X 2058 P
Illustration 19
G1035.4 – 01/2019
one hoist
m/min
400 V
A
9
18
A
9
A
18
B
9
B
18
C
9
B
18
C
6
C
12
D
E
18
Installation and operating manual
two hoists
230 V
400 V
C
A
-
B
E
B
-
D
D
D
-
E
E
D
-
F
-
F
-
F
-
F
230 V
E
-
F
-
F
-
F
-
-
-
-
EN-33

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis