Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing For Commissioning - KNF Laboport N96 Originalbetriebsanleitung

Laborpumpe
Vorschau ausblenden Andere Handbücher für Laboport N96:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Laboratory pump Laboport® N96
Translation of Original Operating Instruction, english, KNF
323241-323242 06/20
9 Operation
9.1 Pump

9.1.1 Preparing for commissioning

Before switching on the pump, ensure the following points:
Necessary operating requirements
à
Pump
All hoses correctly connected
à
Pump
Data of the voltage supply system are con-
sistent with the details on the type plate of
the power supply.
à
Pump outlet not closed or restricted.
Tab.11: Operating requirements for commissioning
9.1.2 Commissioning
WARNING
Risk of burns from hot pump parts and/
or hot medium
Some pump parts may be hot during or
after operation of the pump.
à
Allow the pump to cool after opera-
tion.
à
Take protective measures to pro-
tect against touching hot parts.
Operation
DE
EN
FR
ES
IT
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis