Anleitung STE 5000D_SPK1:Anleitung STE 5000_D
GB
before the onset of outdoor temperatures of bet-
ween -3°C and -10°C.
If the diesel fuel still freezes, you must move the
diesel generator to a place where the temperature
is approximately +10°C for a period of approxima-
tely 12 hours.
If the tank is between halfway and full with normal
diesel fuel, this should then be drain as described
in point 9.4.
Then fill the tank with winter diesel.
If the tank is between empty and half-full, simply
fill it up with winter diesel.
11. Ordering replacement parts
Please quote the following data when ordering repla-
cement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
16
18.01.2007
15:19 Uhr
Seite 16